Remodeling a bathroom takes up a lot of resources and money, but most of all it takes up time. On top of your budget, you need to figure out how long you’ll have contractors going in and out of your home.
So how long does a bathroom remodel take?
In this article, we’ll be outlining the factors that affect bathroom remodels and a general timeline for how long it takes to remodel your bathroom. Let’s dive in.
Factors That Affect Remodel Time
Every bathroom remodel brings its own set of issues and conundrums. Here are some common factors that are going to affect your bathroom remodel timeline:
- Is it a cosmetic overhaul or are you stripping everything down?
- Are you working by yourself or hiring a contractor?
- Is your contractor an owner-operator or are they subcontracting electricians and other professionals?
- Are your equipment and materials ready to go or are you waiting for them to deliver?
With all of these factors in mind, let’s look at how long your bathroom renovation might take in practice.
How Long Does a Bathroom Remodel Take?
So how long does a bathroom remodel take?
We would say anywhere from six weeks to three months. While not every renovation is the same, here is a general timeline for a typical project:
Finding a Contractor
If you’re not going to DIY your bathroom renovation, you need a quality contractor. You might shop around for prices, set project bids, and file a few paper documents to secure a contract.
This will take anywhere from one to three weeks.
Obtain Permits and Approvals
If you’re moving plumbing or gas lines, you’ll probably need a permit. Contractors are great at sorting this out, but how long it actually takes will vary.
It could be as short as two weeks or as long as a month.
Source Materials
Having all your materials ready to go is a surefire way to speed up the process. If you shop for materials that are ready to ship and deliver fast, this could only take a few days or weeks.
Demolition
Now that you’ve got all your paperwork and materials hopefully in order, it’s time to tear your old bathroom down.
This is a speedy process, usually taking no longer than a day.
Rerouting Plumbing and Electrical
Once the walls are torn down, you can reroute plumbing and electrical wires if need be. This should take about a day or two.
Floor Tiles
Redoing the floor tiles will take about two days to complete. Making everything consistent is key even if this is a quick process.
Other Installation
Now it’s time to set everything else up. Whether it’s a new sink, bathroom vanities, a toilet, or even a tub, expect all of it to take about three days.
Clean-Up
Now that everything’s installed, it’s time to dust it all up. You can hire a cleaning specialist to have everything squared away in just about a day.
Cook Up Your Dream Bathroom Renovation Today!
Answering “how long does a bathroom remodel take” yields countless answers. Use this article to gauge how long your bathroom remodel will take and plan effectively.
For more informative home improvement articles and bathroom design tips, check out the rest of our site!